|
Category : Fiber optics components, systems, photonic instrumentation > Photonic instrumentation and components
vo-1 and vo-2 valve operators
|
|
 |
| PRINT |
|
 |
| BACK |
|
1. Extract plunger of operator VO-1 2. Place the adapter over valve and tighten. Finger tightening is sufficient. 3. Push plunger in to plug and screw in 2.5 to 3 turns. There is a mark on the knob. 4. Place the smooth end (0.375 inch/ 9.5mm O.D.) into vacuum system -- the connection may be adapter on pump or a high vacuum hose. 5. Rough pump manifold. Valve still closed.
6. Open valve. Pull out plunger and valve plug to open dewar valve. 7. Evacuate dewar to pressure less than 1E-6 Torr.
8. Close Valve. Push plunger in completely.
9. Close high vacuum valve and vent system, then unscrew plunger from valve plug. Then retract plunger.
10. Loosen the adapter and remove VO-1 from de war.
11. Replace dust cap on valve
Article from Kolmar Technologies
List of all articles from this supplier
- Dewar LJ preamplifier box
- Video buffer drivers
- KA01-E6-AG Preamplifier
- Infrared photon detection system
List of all articles from this supplier
List of articles in this sub-category
- Photon Counting and Photon Timing Educator Pack
- SPMMini Silicon PhotoMultiplier
- PCMPlus USB Photon Counting System
- PCDMini Photon Counting Device
- Photonics fibers
- OEM photonics instruments and sub-systems
List
of all articles in this sub-category Photonic instrumentation and components
List of all articles in this sub-categoryList of all articles in this sub-categoryList of all articles in this sub-category
|